[ 24/06/08 ] Kairiki Completes $11.5 million Financing

Further to the company's announcement on 16 June 2008, the Directors are pleased to advise that the allotment of 49,949,730 ordinary fully paid shares at an issue price of 23 cents per share has been completed.

View Full Post »
[ 16/06/08 ] Kairiki Raises $11.5m to Fund SC54 Drilling Program

Kairiki is pleased to advise that it has reached agreement to place up to 49,949,730 ordinary fully paid shares at $0.23 per share to raise gross funds of $11,488,438 to sophisticated investors

View Full Post »
[ 05/06/08 ] SC 54 Drilling Rig Secured

Kairiki is pleased to announce securing the “WilBoss” jack-up drilling rig for a two well shallow water drilling program in SC 54, commencing after mid October 2008.

View Full Post »
[ 29/05/08 ] Investor Presentation: Hong Kong Investor Update

Kairiki’s recent Investor Presentation from the recent Hong Kong Road trip.

View Full Post »
[ 07/05/08 ] SC 54 Update

Nido’s assessment of their prospects and leads inventory in relation to their offshore Philippines NW Palawan Basin assets, which includes SC 54.

View Full Post »

Goodenough Project

Goodenough ProjectThe Goodenough Project consists of Mining Lease M29/141 in the East Menzies Area of WA, 2.5 kilometres south west of the Granny Venn and Auntie Nelly Open Pits, previously operated by Goldfields Limited. The Project is a high-grade narrow ore zone of gold mineralisation, which has been partially drilled in the past and the mineralisation can be considered to be open down dip and along strike. At the surface, the strike extensions of the present Resource is not closed off to either the east or west or down dip at depth.

Modern exploration has expended an estimated $300,000 since 1969 on exploration and drilling, with an estimated $900,000 being spent on shaft sinking and horizontal development associated with the main shaft. There is an existing headframe, located overhead the shaft, and initial inspection suggests minimum work is required to bring the unit up to standard.

The current price of gold should provide a sound margin over cost figures generated from a typical, small scale, professionally run, high grade, and narrow vein underground mining operation. The Menzies area is well placed for the economic trucking to toll treatment plants, with good roads and access available to the site.

More information about the project is availabe in PDF below.

View / Download Details of the Goodenough Project.